| Customization: | Available |
|---|---|
| After-sales Service: | Installation & Training |
| Layers: | Single-Layer |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency





Name | Steel Structure Warehouse/ Workshop Building | |
Dimensions | Structure System | Portal Frame |
construction time | 23 days finished 40000sqm warehouse installation | |
main steel frame | H columns and beams with gray paint | |
secondary structure | Z purlin with galvanized surface treatment | |
support structure part | Tiebracing,bracing bars,angle steels,all these will improve the stability and durability of the whole structural building | |
roofand wallcomponent | Rock wool Sandwich panel /Fiberglass Sandwich panel /steel sheet/polyurethane | |
door | electric rolling door | |
Advantages | 1. Lower cost with better quality. | |
2. High safety performance. | ||
3. Easy to assemble and dismantle. | ||
4. Manufacture under complete quality control system - ISO9001. | ||
5. Installation with instruction of experienced engineers | ||
6. Non-pollution. | ||
Quotation and Drawings | According to customers' requirements with for free | |







